
| Products: | KIMMU® GABION |
| Location: | Sungai Bertam, Cameron Highlands |
| Background: | The project at Sungai Bertam, Cameron Highlands required a reliable erosion control and slope stabilisation solution to protect the surrounding terrain and water flow area from soil movement and environmental impact. |
| Solution: | KIMMU supplied KIMMU® Gabion as part of the site protection and ground reinforcement system. The gabion structure helps stabilise the embankment while allowing effective water drainage, making it suitable for highland terrain and watercourse protection applications. |
| Results: | The completed installation enhances slope stability and reduces the risk of erosion caused by continuous water flow and changing ground conditions. The project highlights the effectiveness of KIMMU® Gabion in infrastructure and environmental protection applications. |